  • Integrated Industrial & Services Complex Special economic Zones for a leading private group


 
This is the first greenfield Special Economic Zone to be operationalised in India.

Client: WBIDC

Ultimate Built up area: 4.8 lakh sq.ft. In Phase I, 2.5 lakh sq.ft area has been built.

Cost of Phase I: Rs.25 Crore

Current Status:  Export commenced in July 2004, Export for the Year 2006-2007 estimated at Rs.12 billion.
 

 
Built-up area: 2.5 lakh sq.ft including a diamond-shaped, reverse pyramid 6 storied Central Facilities Building (CFB). This building is an engineering marvel and the 6th/top floor has a 10,000 sq.ft column-free auditorium with arched roof. The 7 storied Standard Design Factory has space for 30 manufacturing units.

ICICI-WINFRA’s role in the project:

  • Conceptualized the Project and established its need
  • Prepared DPR and concept plan along with cost estimates and means of financing. Acted as Project Management Consultants for the project.
  • Assisted WBIDC in getting necessary approvals for sector specific SEZ from Ministry of Commerce, GOI.
  • Carried out the bidding process to select suitable contractor on an unique design-build and turnkey execution basis through limited tendering route.
  • Constantly monitored the technical, commercial and financial aspects of the project to ensure smooth completion, start-up and functioning
  • Responsible for marketing the property for which officials of ICICI-WINFRA traveled extensively and conducted road shows in various metro cities. 90% of space in the park has already been sold.

The promoters, WBIDC have already recovered their entire investment

LIST OF OCCUPANTS- STANDARD DESIGN FACTORY

  • Shree Ganesh Jewellery House (P) Ltd.
  • Shree Vinayak Jewellers
  • Concept Images (P) Ltd.
  • B. C. Jain Overseas (P) Ltd.
  • Senco Gold Jewellers
  • Lumi Stars
  • Jewel India (P) Ltd.
  • Rohit Export (Jewellery) Pvt. Ltd.
  • Suman Jewellery (Delhi) Pvt. Ltd.
  • Suraj Diamonds Jewellery Ltd.
  • LGW Ltd.
  • Silver Charms & Jewellery (P) Ltd.
  • Easy Fit Jewellery (P) Ltd,
  • Sumit Jewels (P) Ltd.
  • M/s. Ray Incorporated
  • M/s. Exotica International
  • Modern International
  • P.C. Chandra (Exports) Pvt. Ltd.
  • SCG Exports (P) Ltd.
  • Ellenbarrie Exim Ltd.
  • Umesh Parekh
  • B.C. Sen International Ltd.
  • Sarvan Commercial
  • Janki Marketing
  • Preetam Marketing
  • Anchita Commercial
  • Unilux Technologies (P) Ltd
  • Parekh Jewels (P) Ltd.
  • Zenith International

LIST OF OCCUPANTS - COMMON FACILITIES BUILDING

'Shilpangan' -The Light Engineering Park for toys, handicrafts, sporting goods in Kolkata: Phase I & II completed (Extension of CFB construction about to commence)
 

This is meant for light engineering manufacturing units in the areas of toys, handicrafts, sporting goods, electronics and telecom equipment/assembling and providing support service.

Client:
WBIDC

Ultimate Built up area: 2.0 lakh sq.ft. In Phase I, 1 lakh sq.ft area has been built up with a CFB and an SDF.

Cost of Project:
Rs.17.7 Crore

Current Status:
 All 24 units in phase I operational. All 28 modules in Phase II are booked.

 

ICICI-WINFRA’s role in the project:

  • Conceptualized the project. Prepared Pre-Feasibility Report after detailed analysis of global, domestic and local toy industries.
  • Based on above, DPR and concept plan was prepared, cost estimates and means of financing worked out. Was appointed Project Management Consultants.
  • Designed the entire Park facilities
  • Carried out the bidding process to select most suitable contractors following a two stage open tendering route
  • Constantly monitored technical, commercial and financial aspects of the project to ensure smooth completion, start-up and functioning
  • Responsible for marketing the property. 100% of the space in both in the SDF and CFB were sold well before the completion of the Park.
  • The promoters, WBIDC have made modest profit.

The two projects, Manikanchan and Shilpangan, have brought the concept of multi-storied (6-7 storied) flatted manufacturing factory buildings, built on cluster concept, in a big way to West Bengal.

      LIST OF OCCUPANT - SDF Phase 1  

          Name of Company            Area of operations

  • Manish Tibrewala                 Computerised Embroidery for Baby care items
  • Safcon Seals                       Injection Moulding Plastic Toys
  • EBEL Polymers Pvt. Ltd.        Manufacturer of Apparels
  • Omex Trexim Pvt. Ltd.         Wooden toys, making & printing of carry bags
  • Rakesh Nahata                    Computerised Embroidery for Baby care items
  • Exotica International            Soft toys, plastic moulded toys, gift items
  • Camilla International            Handicraft items like jute based bags, gift bags, etc.
  • Jeevanram Sheodutt Rai       Leather Gloves
  • Krishna Impex                     Fishing Equipment Assembling
  • S. D. Enterprise                   Manufacturer of Apparels
  • Uttam C Sethia Cons (P) Ltd.Sport Goods & Handicrafts
  • Rajpath Cont & Engg Ltd.      Sporting Goods, Gift Items & Toys
  • Krishna Impex                     Sporting Goods
  • Toys Creation Pvt. Ltd.
  • M. K. Agarwal & Co               Toys, gift items, & sport goods
  • Rishav Estates Pvt. Ltd.         Toys, gift items, & sport goods
  • Ajay Kumar Tarafdar             Subcomponent of handicraft & gift items
  • Gaurav Himatsinghka            Wooden Toys & Handicrafts
  • Arun Kumar Himatsinghka      Wooden Toys & Handicrafts

 LIST OF OCCUPANT - SDF Phase 2  

  • M/s. Plastolin Polymers Pvt Ltd
  • M/s. UNIQUE WOOD
  • M/s. Urban Engineering
  • M/s. VIAT INSTRUMENTS
  • Mr. Pradeep Chowdhury
  • M/s NCI Cables Pvt Ltd
  • M/s N S Remedies
  • M/s Aline Curtain Walls
  • M/s Verseon


     



Top
Food Park at Kandua, West Bengal - completed (March 2007)
A composite Industrial Park for food processing industries in Howrah District in West Bengal. The area has bountiful cultivation of potato & rice and is at the end of the supply chain for metro Kolkata. Has 22 fully services plots, all services, housing for workers and fire station.

Details of the project are as follows:

  • Client: WBIDC
  • Park Area: 54 Acres
  • Cost of the Project: Rs.18 crore
  • Current Status: To be completed by Feb 2007
  • ICICI-WINFRA’s role in the project:
    • Turnkey implementation from conception to completion

    LIST OF OCCUPANTS

    Name of the Company                                        Area of Operation
    M/S Dream Bake (P) Ltd -                                       Cakes & Confectionary
    M/S Snow Lion Food (P) Ltd                                     Bread/ Loaf
    M/S Nezone Herbals Pvt Ltd                                     Bhujia, Papad etc.
    M/S Kantian Food & Hospitality (P) Ltd                      Base kitchen
    M/S Triangle Marketing (P) Ltd                                 C&F Agent/ Storage
    M/S Jagmohan S. Chandrani                                   Juices, Sauces, Squash
    M/S True Tone Distributors (P) Ltd                           Cold Storage
    M/S Kejriwal Enterprises                                         Honey processing
    M/S M Agarwal Packaging                                       unit for Food products
    M/S Pampar Oven fresh Foods (P) Ltd                      Snack food products
    M/S Ever Bright Plastic (P) Ltd                                 Food Packaging Unit
    M/S Universal Corporation Ltd                                 Cold storage, warehouse
    M/S Excel Imports (P) Ltd Agro                                Warehouse
    M/S Induss Food Products & Equipments Ltd             Rice Processing equipments.
    M/S Rainbow Commodities & Derivatives (P) Ltd       Agro Warehouse
    M/S Vadilal Industries Ltd                                        Ice cream
    M/S Sunrise Spices Ltd                                           Spices
    M/S Vikash Kumar Jain                                           Cold storage
    M/S Crystal Roadways (P) Ltd                                  Cold storage
    M/S Sumash Developers (P) Ltd                               Agro warehouse
     

  Top

 

  • Sudha Ras (Sankrail Food Park), West Bengal: completed
  • This strategically located park on NH 6, 28 km. from Kolkata is a composite facility for food processing industries.
  • Client: WBIDC
  • Park area: 50 acre
  • Cost of the Project: Rs. 19 Crore
  • Has 22 fully serviced plots including separate Common Facilities Building
  • Current Status : All 22 fully service plots were booked well before the start of construction 10 units have already started Operations.
  • Supported by Min. of Food Processing Industries, GOI
  • ICICI-WINFRA’s role in the project:
    • Prepared detailed project report to assess the feasibility of the project and appropriateness of the location. Appointed Project Management Consultants
    • Also Prepared application to Min. of Food Processing Department, GOI for grant for part financing of the project and helped WBIDC in getting the sanction.
    • Designed the entire Park Facilities.
    • Marketed the project to prospective investors. Completely sold all the plots well before construction work started, making it the most successful Food Park in India.
    • Carried out the Bidding Process for selection of a turn-key contractor through a two stage open tender route.
    • Now monitoring technical, commercial and financial aspects of the project to ensure timely completion, within budgeted cost

    LIST OF OCCUPANTS

    Name of the Company                              Area of Operation
    M/s. Pepsico India Holdings Pvt. Ltd.              Potato Chips & Snacks
    M/s. Favorich Ltd.                                        Rice & Maize Miller
    M/s. National Moulding Company Ltd.            Food Grade Packaging Matl
    M/s. SS Agarwal (Rollick)                             Ice cream
    M/s. Connect Finance Pvt. Ltd.                      Cold Storage
    M/s. SAJ Food Products Pvt. Ltd                    Bakery
    M/s. RCI                                                     Cold Storage
    M/s. Teage Ltd.                                           Baking ingredients
    M/s. R.S. Plasfab Private Limited.                 Packaging unit for potato
    M/s. Gee Pee Foods Pvt. Ltd.                        Potato chips, Biscuits
    M/s Jamuna Vincom Pvt. Ltd.                        Ice Manufacturer
    M/s Kathleen Confectioners.                         Bakery
    M/s Rose Valley Industries Ltd.                     Spice Powder
    M/s Soumya Engineering Works                    Cold Storage
    M/s Surajmal Mohanlal Pvt. Ltd.                    Vegetable & Fruits Processing
    M/s Agarwal & Sureka                                 Chanachur, Bhujia etc.
    M/s Ramuk Scan Investment Pvt. Ltd.           Mango, Pineapple Processing
    M/s. LMJ International Ltd                            Agro warehouse, cold storage

      Top

  • Poly Park at Howrah : completed (March 2007)
  • A Project is for creation of a composite Industrial Park for plastic down-stream industries in Sankrail, Howrah.
    Details of the project are as follows:
  • Client: WBIDC
  • Park Area : 66 acres, on NH 6
  • Cost of the Project: Rs. 17.4 Crore
  • Current Status : Detailed design and selection of contractor is on-going.36 companies have already booked the entire Park.
  • Role of ICICI Winfra: Design the facilities, act as Project Management Consultants with responsibility for marketing the property

        Top

  • Floriculture Infrastructure Complex- Export oriented cut-flower growing venture at Mungpoo in Darjeeling, West Bengal: under preparation
  • This Project was conceived to promote floriculture industry through an integrated approach and creating a central Floriculture Infrastructure Complex with emphasis on Flowers, which can grow naturally in the selected area, requiring minimal expenditure on expensive greenhouses
    Details of the project are as follows:
  • Client: Department of Food Processing Industries and Horticulture Department,
              Government of West Bengal (FPI&H)
  • Ultimate Built up Area: 60 acres.
  • Nature of Financing: Joint Venture with private promoter
  • Current Status: Proposed land for the project is in possession of the Department. BOT partners short-listed through transparent selection process, based on EOIs submitted.
  • ICICI-WINFRA’s role in the floriculture complex project:
    • Prepared Feasibility Report for which ICICI-WINFRA studied and analyzed the Floriculture Industry – in the global, national and local context
    • Identified exact location suitable for natural growing of exportable types of flowers with minimum requirement of costly interventions. For this, ICICI-WINFRA had engaged the services of leading experts from Israel and Holland (UNDP)
    • Prepared Concept Plan identifying the infrastructure needed at the complex and the land requirement
    • Prepared cost estimations and means of financing
    • Circulated the project brief among prospective investors. Selection procedure is under progress.

    Top

  • Food Park at Malda, West Bengal:  completed
  •  This is a composite Industrial Park dedicated for the food processing and related industries with ready to use power, water and other amenities in Malda District in North Bengal. It is 347 Kms away from Kolkata towards the north. Almost equidistant from Kolkata in the south and Siliguri in the north, Malda is an important commercial and trading hub of mid West Bengal. The area has bountiful cultivation of mango and lychee



 

  • Details of the project are as follows:
  • Client: West Bengal State Food Processing & Horticulture Development Corpn. Ltd.
  • A Project of : Department of Food Processing Industries & Horticulture, Government of West Bengal
  • Park area: 42 acres, on NH 34, which is now under improvement with an ADB grant
  • Cost of the Project: Rs.16 Crore
  • Has 35 fully serviced plots including Cold Storage, Warehouse, Truck Parking area with Pay & Use Toilet facility, Effluent Treatment Plant and a separate Common Facilities Center housing a Food Testing & Quality Control & Assurance Laboratory and other facilities, a state of art Food Court and 4 nos Industrial Sheds for small entrepreneurs. A direct access to NH-34 is also under implementation from the Food Park premises.
  • In the first phase of booking 20 out of 35 plots have been sold ie. 57% of plots have been booked. Out of the total saleable area of 28.62 acres, area of 16.75 acres has already been booked. The balance plots are available on first cum first serve basis.
     
  • ICICI-WINFRA’s role in the project :
    o Conceptualized the Project and established its need & designed the entire Park Facilities.
    o Prepared detailed project report to assess the feasibility of the project and appropriateness of the location.
    o Appointed Project Management Consultants
    o Also prepared application to Ministry of Food Processing Department, Government of India for grant to part finance the project and RIDF for loan, thereby assisting WBSFP&HDCL in getting the sanctions and loans.
    o Carried out the Bidding Process for selection of a turn-key contractor through a two stage open tender route.
    o Monitoring technical, commercial and financial aspects of the project to ensure timely completion, within budgeted cost
    o Liasoning and following up with others government departments and organizations to setup the allied facilities of the park
    o Marketing the project to prospective investors



     Top
  • Garment (Apparel) Park in Beliaghata, Kolkata: completed (March 2008)
  • This 500,000 sq. ft. Park is being built on 8.78 acre on Canal South Road for a composite facility for garment/apparel manufacturing units catering to both domestic & export markets. The International Standard Park will provide all facilities/amenities required by the user units.
  • Details of the project are as follows:
  • Client: WBIDC
  • Available area: 8.78 acre.
  • Cost of the project (Phase I): Rs.47 crores
  • ICICI Winfra’s role in the project:
    • Conceptualized the project.
    • Prepared DPR after detailed analysis of the domestic and local Garment / Apparel, Hosiery & Leather industries and the types of garments, hosiery produced in this region.
    • Based on the above, concept plan was prepared, cost estimates and means of financing were worked out.
    • Carried out the Bid Process Management to dismantle, remove and sell the movable and immovable assets, existing at site.
    • Prepared detailed plan and design of the Park with its facilities.
    • Prepared Tender Document and released to short-listed construction companies
    • Preparing ASIDE application for off-site infrastructure

    LIST OF OCCUPANTS - SDF

  • Manish Creation
  • Sarat Exports Pvt. Ltd.
  • The Rajlakshmi Cotton Mills Pvt.Ltd.
  • Enfield Exports Ltd.
  • Go Go International
  • WEAVER SERVICE CENTRE
  • Ethnic Creations Pvt. Ltd.
  • Rahul Computex Pvt Ltd.
  • Sushil Kumar Chopra
  • Pecon Computers Pvt. Ltd.
  • Rupa & Co. Ltd
  • Govardhan Banijya Pvt Ltd
  • Rose Impex Pvt. Ltd
  • M/s EKRU Alluring Designs
  • Jagadhatri Traders
  • Rose Valley Industries Limited,
  • Shagun Overseas
  • M/s Rekha Agarwal
  • M/s Raghav Enterprises
  • Madona Creations Pvt Ltd
  • Janton
  • Amarnath Choudhary
  • True Tone Distributors Pvt. ltd
  • Designer Apparels
  • M/s Anita Real Estate Private Limited.
  • Shyam Fashions Pvt Ltd.
  • G.H Agencies
  • Mac-One Apparels

LIST OF OCCUPANTS - CFB

  • Vikash Enterprises
  • Sarveshwari Raj Knit-Wear
  • C.M Ladha
  • Mahesh Kumar Agarwal
  • Shankar Traders & Distributors Pvt Ltd.
  • Resurgent India Ltd.
  • Ginni Systems Ltd
  • Ajay Ganeriwal
  • Manju Bhuwania/Abhinav Bhuwania
  • Sandeep Sethi
  • Sombit Commercial Pvt ltd,
  • Cosmo Polymers Pvt Ltd
  • Pankaj International
  • Top

     

    • Industrial Park for artisan in Howrah : under preparation
    • Assignment involves preparation of project feasibility report and site selection for one or more small industrial parks for small manufacturing units in jewellery and zari clusters in Howrah district. Report under preparation.

            Top

    • Industrial Park at UluberiaStart Up phase
    • A Project is for creation of a General Purpose Industrial Park for an assortment of industries in Uluberia, Howrah. Site is 57 km. from Kolkata
      Details of the Project are as follows:
    • Client: WBIDC
    • Park Area: 450 acre on NH-6.
    • Cost of the Project  Rs.112.5 Crore
    • Current Status: The concept plan is now under preparation.
    • ICICI Winfra’s role in the project:
      • Prepared Inception Report & Techno Economic Feasibility Report for setting up of the Park after visits and detailed analysis of the tea processing units in India and abroad.
      • Based on above, concept plan was prepared, cost estimates and means of financing was worked out.

      Top
       

    • Tea (Processing) Park at Siliguri, West Bengal : under preparation
    • Tea Board India wishes to set up a Tea (Processing) Park for boosting tea exports from eastern region (Siliguri near Bagdoga Airport) of India.
    • Details of the Project are as follows:
    • Client: WBIDC
    • Total Area : 100 acre.
    • Cost of the Project :
    • Status of the Project: Techno Economic Feasibility Report already submitted to Tea Board India.
    • ICICI Winfra’s role in the project:
      • Prepared Inception Report & Techno Economic Feasibility Report for setting up of the Park after visits and detailed analysis of the tea processing units in India and abroad.
      • Based on above, concept plan was prepared, cost estimates and means of financing was worked out.

      Top

    • Light Engineering Park at Siliguri, West Bengal : under preparation
    • The project involves market research, planning the appropriate product based on that research and preparation of feasibility report for that particular product.
      Details of the Project are as follows:
    • Client: Sumeru Estates Private Limited
    • Park Area:
    • Cost of the Project 
    • Current Status: The concept plan is now under preparation.
    • ICICI Winfra’s role in the project:
      • Prepared Inception Report & Techno Economic Feasibility Report for setting up of the Park after visits and detailed analysis of the tea processing units in India and abroad.
      • Based on above, concept plan was prepared, cost estimates and means of financing was worked out.

      Top

    • Light Industrial Park in Apollo Zipper: planning phase
      Details of the Project are as follows:
    • Client:  WBDIC
    • Park Area: 0.5 acre
    • Cost of the Project : Rs.10.51 crore
    • ICICI Winfra’s role in the project:

      Preparation of feasibility report and Project Management Consultant

      Top

    • Hosiery Park : planning phase
      Details of the Project are as follows:
    • Client:  West Bengal Hosiery Association
    • Park Area: 100.0 acres Built up area : 272000 sq ft approx
    • Cost of the Project : Rs. 1115.70 million
    • Current Status: DPR submitted to MoFPI for consideration of grantunder SITP scheme.
    • 146 plots totaling 78.67 acres have already been booked out of the total 159 plots
    • ICICI Winfra’s role in the project:

      Preparing Detailed project report for the proposed projects & PMC.

      Top

    • Integrated Industrial & Services Complex Special economic Zones for a leading private group :
    • Assignment involves preparation of project feasibility report on setting up of Special Economic Zone (SEZs) for Elecronic Goods Sector & Services sector in a cluster concept on the Kalyani Expressway Highway
      Details of the Project are as follows:
    • Current Status: Client received approval from Govt. of India
    • ICICI Winfra’s role in the project:
      • Advised the group on appropriate location and prepared the Feasibility Report on setting up of such SEZs.

      Top

    • Factory Building ( Hunger) : preparation of tender document
      Details of the Project are as follows:
      Hunger Hydraulics is one of the largest manufactures of seals for Hydraulics equipments. It’s started its operation in Germany in 1977 and its present turnover is above € 6 million. Hunger has parched a plot in Sankrail to explain its manufacturing activities in India.
      Client:  W.Hunger Hydraulics India Private Limited
    • Park Area: .59 acres
    • Cost of the Project : Rs. 21.20 crore50.00 million
    • Current Status: Planning Phase
    • ICICI Winfra’s role in the project:

      Preparing Detailed project report for the proposed projects & PMC.

      Top

    • Kandua Food Park, West Bengal : completed
      Details of the Project are as follows:
      The Industrial Parkis a composite facility for industries in food processing on NH-6, 21 km. from Kolkata
    • Client:  WBDIC
    • Park Area: 51.0 acres
    • Cost of the Project : Rs.18.7 crore
    • Current Status: Project Completed
    • ICICI Winfra’s role in the project:

      Turnkey implementation from conception to completion.

      Top

    • Garment Park Phase II in Beliaghata, Kolkata
      Details of the Project are as follows:
    • Client:  WBDIC
    • Approximate land area developed in Phase – II : 2.5 Acres
    • Approximate Total Sq. Feet to be Developed: 350000 Sq Ft
    • Approximate Cost of Construction : 31.80 Crores
    • Approximate Cost of Project: 42 Crores
    • Salient Features:
      a. Post Tensioned Flat Slab Construction
      b. Basement Car Park
      c. Passenger & Goods Lift
      d. Multi-storied Car Park with Ground Floor Truck Park
    • Scope of Consultancy:
      Bid Process Management
      Detailed Design
      Co-ordination with Statutory Authorities
      Over all supervision and monitoring of Project
      Marketing of Project




     