Client:
WBIDC
Park area: 50 acre
Cost of the Project: Rs. 18 Crore
Has 22 fully serviced plots including cold storages, warehouse
and separate Common Facilities Building and a Standard Design
Factory for small units
Status of the Park: The Park is expected to be completed
by November 2005. Frito Lay (a Pepsico group company) is already
operational in the Park.
Supported by Min. of Food Processing Industries, GOI
Top
- Floriculture Infrastructure
, Darjeeling: under implementation
Client: Food Processing Industries
and Horticulture Department,
Government of West Bengal (FPI&H)
Ultimate Built up Area: 60 acres.
Nature of Financing: Joint Venture with private promoter
Status of Project: Proposed land for the project is in
possession of the Department. BOT partners short-listed through
transparent selection process, based on EOIs submitted.
-
Garment
(Apparel) Park in Beliaghata, Kolkata: under
conception
Client: WBIDC
Available area: 8.78 acre.
Cost of the project (Phase I): Rs.47 crore
Status of Project: Detailed Project Report (DPR) has
already been submitted. Survey and clearing work, also complete.
Property in possession of WBIDC.
- Tea (Processing) Park at Kolkata:
under conception
Client: Tea Board India
Ultimate Built up area (Phase I): 14 acre.
Cost of the Project (Phase I): Rs.28 Crore
Status of the Project: Inception Report and Techno Economic
Feasibility Report have already submitted to Tea Board India.
-
Industrial
Park for small scale manufacturers of Gems & Jewellery and
Gold Zari
Client: WBIDC
Proposal is for setting up a Park for small scale manufacturers
who can complement the larger manufacturer/exporters. Project
feasibility report is under preparation.
Top
-
Mani
Square: under
preparation
Client: Mani Group
Ultimate Built up area: 12.58 acre.
Cost of the Project (Phase I): Rs.114.58 Crore
Status of the Project: The Feasibility report
is under preparation.
- Reclamation of North Canal
System of Kolkata: under implementation
Client : Transport Dept through
WBTIDC
ICICI-WINFRA's role in the project:
Prepared
the pre-feasibility report
-
Business
plan for setting up a fruit processing manufacturing unit in
Siliguri
Client: A joint sector existing company
ICICI WINFRA's
scope of work in the assignment: Preparing a bankable
Project Report after careful assessment of availability of raw
material (pineapple and tomato) and possible Markets
Top
-
Assisting
Andrew Yule in divesting its balance stake in Phoenix Yule
: under implementation
ICICI-WINFRA's role in the project:
Reviewed the
Joint Venture Agreement (specifically the clauses in regard
to the transfer of shares in the JV Co. amongst the promoters.)
entered into between the client and Phoenix Yule
Arrived at the Fair Market Value of the shares of the JV Co.
For this purpose, valuation of equity shares was worked out
under different methods viz. Net Asset Value method, Discounted
Cash Flow method, P/E ratio method etc. and a report on the
same was submitted.
- Transfer of tea division
on management contract basis:
under implementation
Client:Andrew Yule Co. Limited
ICICI-WINFRA's scope of work in the assignment:
Carried out study of tea division garden wise, area wise and as
a whole based on financial performance, issues relating to manpower,
inter dependency between tea gardens etc.
Based on the study carried out, tea gardens, individually or in-group,
have been short-listed for the purpose of giving on Management
Contract basis.
Final Report has been submitted
For details of these projects mentioned
above please visit our IWIN PROJECTS section
Top |