| IWIN
PROJECTS > Infrastructure
> Roads
& Transportations
The project was for building a multi model Transport Corridor,
with suitable support infrastructure in the state of West Bengal.
ADB funded the study for development of this project.
ICICI-WINFRA’s role in the project:
- 8-km bypass road on SH1, Diamond Harbor Road at Amtala for
PWD
- Flyovers and under-passes on Kazi Nazrul Islam Avenue (VIP
Road) for PWD
- 6-km access road for MCPL in Haldia for the Haldia Development
Authorit
Top
- Preparation of DPR for
rural roads under PMGSY Scheme in Paschim Midnapore District : completed
- Details of the Project are as follows:
- Client : WBSRDA
- ICICI-WINFRA’s role in the
project:
- The project involves Field Study for existing Road
alignment, Study of Local Demography, Soil & Materials for
Road Works. On the basis of that Design of the Proposed Road
is made. The project also includes Finalization of BOQ and
Estimation of Total Cost
Top
-
Setting up a Truck
Terminal near Bongaon: completed
Truck Terminal is proposed to be set up to facilitate the
transport of cargo through the Bangladesh-India border land
check post at Petrapole.
Details of the Project are as follows:
- Client : Transport Dept
through WBTIDC
- ICICI-WINFRA’s role in the
project:
- Preparing DPR for the proposed project
Top
|